Serving Bellevue & the Eastside Mon–Fri 8a–5p
Spa-style primary bathroom remodel with a freestanding tub and black-framed glass shower
Our Services

Bathroom Remodels

A beautiful bathroom is won or lost behind the walls. We rebuild from the substrate up so the waterproofing and craftsmanship match the finishes — then layer in the tile, stone, lighting, and fixtures that turn an everyday bathroom into a true retreat.

From a hardworking guest bath to a spa-like primary suite, our team designs and builds it together, so the look you approve is the one that gets built.

Typical timeline

Design & selections2–4 weeks
Construction4–6 weeks
Typical total6–10 weeks

What’s involved

  • Layout & fixtures
  • Full waterproofing
  • Tile, stone & glass
  • Vanities & storage
  • Lighting & ventilation
  • Heated floors (optional)
← All services
Good to Know

Frequently asked questions

Do you subcontract the work?
No — our own team designs and builds your bathroom, with one project manager as your single point of contact.
How long does a bathroom remodel take?
A typical primary or guest bath runs about 6–10 weeks: roughly 2–4 weeks of design and selections, then 4–6 weeks of construction.
How do you make sure it won't leak down the road?
We rebuild from the substrate up and waterproof properly before any tile goes on — the part you can't see is where a bathroom is won or lost.
Can you work with a small footprint?
Absolutely. Smart layout, the right fixtures, and continuous materials make even a compact bath feel like a retreat.
Start Your Project

Ready to start your dream project?

Tell us what you’re dreaming up and we’ll set up a free in-home consultation — design and build, all under one roof.